Case study, client not named
Case study: a multi-day international sporting event
The client ran the sport. OTAS ran the operation around it, over three editions from 2024 to 2026.
The client and the event are not named on this page.
8 functions, each run by OTAS or planned with the client's team
| Function | OTAS role | What OTAS did |
|---|---|---|
| Site | We ran this | OTAS held daily on-site responsibility for build and break, covering contractor supervision, signage and segregation, a written site log, make-good and the CDM handover. |
| Safety | We ran this on site | OTAS led safety in event week, and day-to-day health and safety through build and break, with daily walk rounds, pre-event inspections 24 to 48 hours before opening and contractor RAMS review with the client's safety adviser. |
| Event Control | We ran this | OTAS ran the control room and kept the Event Control log, with safety decisions in writing, ran all-channel radio checks and introduced a digital log in 2026. |
| Logistics | We ran this | OTAS ran the delivery schedule and laydown through build, and deliveries around the site in event week. |
| Security | We planned it with the client's team | Wrote the security deployment plan position by position for the client's security contractor, whose contract the client held. |
| Medical | We planned it with the client's team | Medical cover came from a provider contracted to the client, with medical calls routed through Event Control. |
| Traffic | We planned it with the client's team | Parking and vehicle access were allocated, including participant drop-off and Blue Badge parking. |
| Activations | We planned it with the client's team | Sponsor activation build and break were scheduled into the site programme and checked on site. |
Where we run a function, it sits under our own contract and we do the work ourselves. Where we plan it with you, your team or a contractor you appoint, hold the contract and run it, with their own supervisors managing their staff. We agree the plan with them and link them to Event Control. For security, OTAS does not manage or supervise SIA-licensed staff. We agree which arrangement applies to each function before the job starts.
Strategic outputs
- A CDM plan and handover, and a post-event report (2025).
- A written safety advice note to the client's leads on threat level, readiness for the Terrorism (Protection of Premises) Act 2025 (Martyn's Law), CCTV coverage, ingress and egress and Event Control (2026).
- A post-event debrief with a costed service model for the next edition (2026).
Services used
- Event Operations Management
- Event Safety Management
- Event Control
- Site Operations
- Event Operations Planning
- External Operations and Community Liaison
The photo on this page is from the OTAS photo library and is not from this event.